My Wardrobe Steamer Trunk

Sunday, 25 November 2018

The Final Outcome

'After 16 months of work' 













Posted by My Wardrobe Steamer Trunk at 02:17
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Older Post Home
Subscribe to: Post Comments (Atom)

About Me

My Wardrobe Steamer Trunk
View my complete profile

Blog Archive

  • ▼  2018 (9)
    • ▼  November (9)
      • The Final Outcome 'After 16 months of work'  ...
      • Side Two - Lower Level All the drawer rails we...
      • Reference  http://www.shenandoahrestoratio...
      • Before and After Originally bought 1
      • Adding the Locks Both original locks were ei...
      • Side Two  Side two of the trunk with its ...
      • Side Two - Canvas - Brass and Painting I app...
      • Rejoining Side One's Structure With the lining...
      • Re-lining the trunk  Cardboard was nailed ...
  • ►  2017 (13)
    • ►  September (13)
Simple theme. Powered by Blogger.